INSTALLATION

Download

General Procedure Installation

  • Install floor channel on top of the foundation using viser
  • Fill the cement and water on top of the floor channel
  • Install the corner side of the Penny Panel first
  • Install steger as temporary holder
  • Install the Penny Panel in cross to form L shape
  • Fill the special filler on every Panel joint
  • Anchor every joint corner
  • Use clamp to make every Penny Panel join tight

Finishing

  • Fill the gap between panel with filler
  • Use compound on every Penny Panel joint after installing he fiba tape
  • Penny Panel is ready to be painted